ldndecks logo
ldndecks logo

Get A Free Quote

Composite Deck Cost in Northern Virginia (2026)

Brand-by-brand pricing for Trex, TimberTech, AZEK & Fiberon — with real project totals

Quick Answer:

A composite deck in Northern Virginia costs $30–$75 per square foot installed in 2026. For a typical 300 sq ft deck: Trex runs $15,000–$25,000, TimberTech $18,000–$32,000, and AZEK $22,000–$38,000. Northern Virginia prices run 25–35% above the state average due to higher labor rates and stricter codes. Call (571) 655-7207 for an exact quote.

Custom composite deck installation in Northern Virginia — Trex Transcend in Havana Gold

If you're researching composite decking prices in Loudoun County, Fairfax County, or Prince William County, you've probably noticed that most online cost guides give national averages that are wildly off for our market. A HomeAdvisor estimate of “$22 per square foot” has no connection to what a licensed Northern Virginia contractor will actually charge you.

This guide uses our own project data from 2024–2026 builds across Ashburn, Leesburg, Reston, McLean, Centreville, and Manassas. Every number below reflects what homeowners in this market actually paid — materials, labor, permits, railings, and cleanup included.

Composite Deck Cost by Brand (Installed)

The brand and product line you choose is the single biggest factor in your final price. Here's what each major composite manufacturer costs per square foot when professionally installed in Northern Virginia:

Brand & LineCost/sqft (installed)300 sqft Total500 sqft TotalWarranty
Trex Enhance Basics$30–$42$9,000–$12,600$15,000–$21,00025 yr
Trex Enhance Naturals$35–$48$10,500–$14,400$17,500–$24,00025 yr
Trex Transcend$45–$60$13,500–$18,000$22,500–$30,00025 yr
Trex Transcend Lineage$50–$65$15,000–$19,500$25,000–$32,50050 yr
TimberTech Pro$40–$55$12,000–$16,500$20,000–$27,50030 yr
TimberTech Edge Prime+$45–$60$13,500–$18,000$22,500–$30,00030 yr
TimberTech AZEK Vintage$55–$70$16,500–$21,000$27,500–$35,00050 yr
TimberTech AZEK Harvest$50–$65$15,000–$19,500$25,000–$32,50050 yr
Fiberon Good Life$30–$42$9,000–$12,600$15,000–$21,00025 yr
Fiberon Concordia$40–$55$12,000–$16,500$20,000–$27,50025 yr

Prices include decking boards, hidden fasteners, framing, and standard labor. Railings, stairs, permits, and add-ons are additional — broken out below.

What's Included in the Per-Square-Foot Price

Included

  • Composite decking boards
  • Hidden fastener system
  • Pressure-treated wood subframe
  • Joist tape (moisture barrier)
  • Concrete footings (helical piers extra)
  • Ledger board attachment and flashing
  • Standard labor and installation
  • Jobsite cleanup and debris removal

Additional Costs

  • Railings: $3,000–$12,000
  • Stairs (per flight): $1,500–$4,000
  • Permits: $200–$800
  • Demolition of old deck: $1,500–$4,000
  • Elevation >4 ft: +15–25%
  • LED lighting package: $1,500–$4,000
  • Helical piers (vs poured): +$200–$400/pier
  • Under-deck drainage (Trex RainEscape): $3,000–$6,000

Trex Decking Cost Breakdown (Our #1 Installed Brand)

As a Trex Platinum Partner — a designation held by fewer than 1% of deck builders nationally — we install more Trex than any other brand. Here's how the three main Trex lines compare for Northern Virginia homeowners:

Trex Enhance ($30–$48/sqft installed)

The entry point into Trex composite. The Basics line offers solid, uniform colors while Naturals adds multi-tonal wood grain streaking. Both feature Trex's shell protection for fade, stain, and mold resistance. Best for homeowners who want composite durability at the closest price point to wood. Typical full project (300 sqft deck + aluminum railing + 4-step stair): $18,000–$24,000.

Trex Transcend ($45–$65/sqft installed)

Our most-installed product line. Transcend boards have a deeper, more realistic wood grain and the thickest protective shell in the Trex lineup. The color palette — Havana Gold, Spiced Rum, Island Mist, Lava Rock — is specifically designed to complement Virginia's red brick and stone colonial architecture. Typical full project (350 sqft + Trex Signature railing + multi-step stair): $28,000–$38,000.

Trex Transcend Lineage ($50–$65/sqft installed)

Trex's newest premium tier, launched in 2024. Lineage features the most realistic wood grain ever produced in composite — you genuinely cannot tell it from hardwood without touching it. Backed by a 50-year fade and stain warranty. Typical full project (400 sqft + Trex Signature railing + lighting): $35,000–$48,000.

TimberTech & AZEK Cost Breakdown

TimberTech and AZEK are manufactured by the same parent company (AZEK Building Products). TimberTech composites use a wood-plastic composite core, while AZEK uses a full polymer (PVC) core — no wood content at all. As a TimberTech Certified Installer, we offer their full product range.

TimberTech Pro & Edge ($40–$60/sqft installed)

Direct competitors to Trex Transcend. TimberTech's polymer cap is approximately 35% thicker than Trex's, which some contractors argue delivers better long-term scratch resistance. The Edge Prime+ line features a distinctive wide-plank look (5.5” boards) that photographs beautifully. Typical full project (300 sqft + composite railing): $22,000–$32,000.

TimberTech AZEK ($50–$75/sqft installed)

The premium tier — full PVC with zero wood content. AZEK boards are virtually impervious to moisture, will not swell or contract, and carry a 50-year warranty. The Vintage collection (Mahogany, English Walnut, Coastline) delivers the deepest color saturation in the industry. Ideal for pool decks, waterfront properties, and homeowners who want the absolute best regardless of budget. Typical full project (400 sqft + AZEK railing + stair lighting): $38,000–$55,000.

Total Project Cost by Deck Size

These are all-in estimates including decking, standard aluminum railing, one staircase, footings, permits, and labor — the number that actually hits your bank account:

Deck SizeTrex EnhanceTrex TranscendTimberTech AZEK
150 sqft (10x15)$8,000–$12,000$12,000–$16,000$15,000–$20,000
200 sqft (12x16)$10,000–$15,000$15,000–$20,000$18,000–$26,000
300 sqft (16x20)$15,000–$22,000$22,000–$30,000$28,000–$38,000
400 sqft (16x25)$20,000–$28,000$28,000–$40,000$35,000–$50,000
500 sqft (20x25)$25,000–$35,000$35,000–$48,000$42,000–$60,000
600+ sqft (Multi-level)$30,000–$42,000$42,000–$58,000$52,000–$75,000

8 Factors That Drive Composite Deck Costs Up

1. Elevation and Multi-Level Design

A ground-level deck needs minimal substructure. A second-story deck attached to a walkout basement requires 6x6 engineered posts, additional concrete footings, lateral bracing, and significantly more labor hours. Expect a 15–30% premium for decks over 4 feet above grade.

2. Railing Selection

Standard aluminum railings add $3,000–$6,000 to a typical project. Upgrading to cable railing or Trex Signature composite railings pushes that to $6,000–$12,000. Glass panel railings can exceed $15,000.

3. Stairs and Access Points

Each composite staircase costs $1,500–$4,000 depending on width and number of steps. Wrap-around stairs or cascading multi-landing designs can add $5,000–$10,000.

4. Demolition of an Existing Deck

If we're replacing an old wood deck, demolition and hauling adds $1,500–$4,000 depending on size. This is sometimes avoidable — if the existing subframe is sound, deck resurfacing can save 25–40% versus a full tear-down and rebuild.

5. Integrated Lighting

Low-voltage LED deck lighting — riser lights, post cap lights, and under-rail strips — adds $1,500–$4,000. Worth every dollar for evening entertaining and safety.

6. Under-Deck Drainage Systems

Trex RainEscape or similar membrane systems capture water from the upper deck and funnel it into gutters, creating a dry patio space underneath. Adds $3,000–$6,000 but effectively doubles your usable outdoor area.

7. Northern Virginia Labor Premium

Skilled carpentry labor in the DC metro area commands $45–$75/hour — 25–35% above the Virginia state average. This is the primary reason Northern Virginia deck prices exceed national estimates. The labor premium is unavoidable, but you can manage it by choosing a straightforward rectangular design that minimizes complex framing cuts.

8. Permit and HOA Timeline

County permits ($200–$800) and HOA approvals don't directly increase material costs, but extended timelines can affect scheduling and pricing. Loudoun County permits currently take 2–4 weeks; Fairfax County 3–5 weeks.

Real Composite Deck Projects: What Our Clients Paid

These are actual project costs from our 2024–2026 builds in Northern Virginia — not estimates or national averages:

$18,500280 sqft Trex Enhance, Manassas

Single-level deck replacing a 15-year-old pressure-treated original. Trex Enhance Naturals in Toasted Sand, standard aluminum railing, 3 stairs to grade. Prince William County permit. Built in 2 weeks.

Client saved ~$8,000 vs Transcend by choosing Enhance — same 25-year warranty, slightly less wood-grain depth.

$32,000380 sqft Trex Transcend, Ashburn

L-shaped composite deck with picture-frame border. Trex Transcend in Havana Gold, Trex Signature composite railing in Charcoal Black, integrated LED post cap lights. Brambleton HOA approved in one submission. Loudoun County permit in 14 days. Built in 2.5 weeks.

The L-shape added ~$3,000 vs a simple rectangle due to extra framing and waste cuts.

$44,000420 sqft TimberTech AZEK, Great Falls

Elevated deck (6 ft above grade) with TimberTech AZEK Vintage in Mahogany. Cable railing system, wide cascading staircase with riser lights, Trex RainEscape drainage underneath. Fairfax County permit. 3.5-week build.

Client chose AZEK specifically because the deck borders a pool — full PVC resists pool chemical splash damage.

$56,000550 sqft Multi-Level + Pergola, Leesburg

Two-level Trex Transcend Lineage deck with attached 12x14 cedar pergola. Upper level: dining/grilling zone. Lower level: fire pit lounge with bench seating. Hidden LED stair and accent lighting throughout. Loudoun County permit. 4-week build.

Building the pergola simultaneously with the deck saved ~$4,000 vs adding it later (shared footings and labor mobilization).

Composite vs Wood: 15-Year Total Cost of Ownership

The upfront cost of composite is 40–60% higher than pressure-treated wood. But decking is a 15–25 year investment, not a one-time purchase. Here's what a 300 sq ft deck actually costs over 15 years:

Cost ComponentPressure-Treated WoodTrex Transcend
Initial build (300 sqft)$8,000–$10,500$18,000–$22,000
Staining/sealing (every 2 yrs x 7)$4,200$0
Board replacement (yr 8–12)$2,000–$3,500$0
Power washing (annual)$2,250$750
Your time (weekends maintaining)100+ hours~5 hours
15-Year Total$16,450–$20,450$18,750–$22,750
25-Year Total (wood rebuilt at yr 15)$30,000–$38,000$19,500–$23,500

Bottom line: Composite costs more in year one but breaks even by year 7–8 and saves $10,000–$15,000+ over 25 years. For a deeper material-by-material breakdown, read our composite vs wood deck comparison.

7 Ways to Reduce Your Composite Deck Cost

1. Choose Trex Enhance Over Transcend

Enhance carries the same 25-year warranty as Transcend at 20–30% lower cost. The aesthetic difference is subtle — Enhance has less wood-grain variation but identical structural performance.

2. Keep It Rectangular

Every angle, curve, and notch adds framing complexity and material waste. A simple rectangle maximizes usable square footage per dollar.

3. Resurface Instead of Rebuild

If your existing deck's subframe is sound, resurfacing saves 25–40% by reusing the pressure-treated structure underneath.

4. Build in Fall or Winter

Spring and summer are peak season — crews book out 4–8 weeks. Building in fall or winter can save 5–10% and gets you on the schedule faster.

5. Start with Standard Aluminum Railings

Aluminum railings ($3,000–$6,000) look clean and last decades. Upgrading to cable or composite railings is easy to do later without modifying the deck structure.

6. Skip Under-Deck Drainage (for Now)

RainEscape adds $3,000–$6,000. It's a fantastic upgrade but can be retrofitted later if budget is tight now.

7. Bundle With Other Outdoor Projects

Adding a pergola, fence, or patio at the same time saves on mobilization and shared labor. We typically see 10–15% savings on the add-on when bundled with a deck build.

Permit Costs by County

CountyPermit FeeTypical TimelineNotes
Loudoun County$200–$5002–4 weeksOnline submission via LOLA portal
Fairfax County$300–$6003–5 weeksRequires plot plan with setbacks
Prince William County$200–$4002–3 weeksFastest turnaround in our service area
Arlington County$250–$5003–4 weeksStrict historic district overlays in some areas
Stafford County$150–$3502–3 weeksMost straightforward process

We handle 100% of the permitting process in-house — submitting plans, coordinating with your HOA, and scheduling inspections. You don't visit the county office once.

2026 Composite Deck Pricing Trends

Tariff Impact on Materials

Recent tariff activity has increased pressure on imported decking hardware and certain fastener systems. While major composite boards (Trex, TimberTech) are manufactured domestically, aluminum railing components and some fastener systems have seen 8–15% increases since late 2025. Read our full tariff impact analysis.

Labor Market

Skilled carpentry labor remains tight in Northern Virginia. Experienced framing crews command premium rates, and the best contractors are booking 4–8 weeks out during spring/summer peak season. Early planning is critical — we recommend reaching out 6–8 weeks before your desired start date.

Material Innovation

Trex Lineage and TimberTech's expanded Harvest collection have pushed composite aesthetics to a point where they are genuinely indistinguishable from hardwood at normal viewing distance. The premium for these ultra-realistic lines is 10–15% above standard Transcend/Pro pricing but is increasingly popular with homeowners in McLean, Great Falls, and Vienna.

Frequently Asked Questions

How much does a composite deck cost in Northern Virginia in 2026?

A composite deck costs $30-$75 per square foot installed. A typical 300 sqft Trex Transcend deck runs $18,000-$28,000. TimberTech and AZEK premium lines range $25,000-$45,000+ for the same size.

Is Trex or TimberTech cheaper?

Trex is generally 10-20% less expensive. Trex Enhance starts at $30/sqft installed while TimberTech Pro starts at $40/sqft. TimberTech's thicker polymer cap justifies the premium for some homeowners.

Why is composite decking more expensive in Northern Virginia?

Skilled carpentry labor near DC commands $45-$75/hour — 25-35% above the state average. Stricter codes, longer permit timelines, and HOA reviews add cost and time.

Is composite decking worth the cost over wood?

Yes. Over 15 years, composite costs less than wood when you add staining ($300-$800/year), board replacement, and your time. Composite lasts 25-50 years vs 10-15 for wood and recoups 65-80% at resale.

What is the cheapest composite decking brand?

Trex Enhance Basics at $30-$42/sqft installed. Fiberon Good Life is comparable. Both carry 25-year warranties.

How much does it cost to build a 400 sq ft composite deck?

$16,000-$30,000 with Trex or $22,000-$42,000 with TimberTech/AZEK. Add $3,000-$8,000 for railings, $1,500-$4,000 for stairs, and $200-$800 for permits.

Related Guides

Get Your Composite Deck Priced

Guides Northern Virginia Homeowners Are Reading

Deck Permits in Fairfax County

Requirements, timeline, fees, and inspection process.

HOA Deck Rules in NoVA

Approval process, common restrictions, and tips.

Best Time to Build a Deck

Month-by-month calendar — winter gets 10-15% better pricing.

Deck Maintenance Checklist

Seasonal care guide for Virginia climate.

Deck Railing Options & Costs

Composite, aluminum, cable, glass — compared.

Get In Touch

Ready To Build Your
Dream Deck?

Reach out to our team of expert craftsmen today. Whether you have a firm plan in mind or need inspiration, we are here to provide a free consultation and exact quote for your outdoor project.

Call Us Anytime+1 (571) 655-7207
Email Usoffice@ldndecks.com
Our Location13704 Winding Oak Cir, Centreville, VA 20121, Virginia
Main Office & Warehouse8735 Quarry Rd., Unit 102, Manassas, VA, 20110

Request Your Free Design Consultation